PET WORK WEEK COMMENCING 8TH JANUARY

Work was completed in the following areas:

  • Edged The path in the Community Garden
  • Cut up and removed large pine tree branches from the footpath at Bartholomew Road
  • Swept broken glass from the kerb edge on Lawley Drive
  • Swept the path at Old Park following the damage caused to the green space by contractors
  • Removed 2 plastic bollards from the pool at Old Park
  • Pruned around the steps at the rear of Acer Close
  • Hard pruned along the footpath from Churchward Drive to Teawell Close
  • Replaced a vandalised dog fouling sign by Newdale Pool
  • Removed leaves from the wall line at St John’s Church
  • Filled in ruts on the verge at Arleston Lane
  • Cut back overhang from the St Helier end of the West Centre Way footbridge
  • Removed fly tipped car parts from Cedar Close
  • Removed 2 abandoned highway bollards from the verge at Lawley Drive
  • Swept glass from the footpath at Bartholomew Road
  • Scraped and weeded the footpath on Glendale
  • Litter picked around the pond on Lawley Village Green
  • Litter picked around the pool at Old Park
  • Scraped the footpath on the Trundle back to the edging board
  • Cut back overhanging roses at the rear of Thomas Telford School

Posted in PET Work.