Ironbridge Way

Please see the attached letter that has been sent to immediate residents of the Ironbridge Way path which will see temporary works enabling access for soil works on phase 11 and for the lowering of the gas main that runs along the path. The path will not be closed but to enable safe use by pedestrians over the next 3 – 4 weeks there will be a ‘banksman’ on site to mange foot traffic and any lorry movements during the day.

Ironbridge Way- Phase 11 temp.works

Posted in Planning Updates.