PET WORK WEEK COMMENCING 8TH APRIL

Work was completed in the following areas:

  • cleared up concrete left by workmen following the removal of signposts on the grass verge
  • removed a fly tip of household waste from the bottom of Rock Road by the motorway bridge
  • swept up glass from the fly tip incident above
  • removed a household waste fly tip from the verge on Bellpit Road
  • litter picked Lawley Community Garden
  • weeded around the railings on the footpath off Teawell Close
  • swept the footpath and weeded around the pedestrian crossing on West Centre Way behind Morrisons
  • weeded the shrub beds on Old Park Open Space
  • mowed the grass verges on the Wrekin Trundle
  • mowed around the entrance to the bridleway off Wes Centre Way
  • removed a small commercial fly tip on Colliers Way
  • weeded the flower beds and herb garden in the Community Garden
  • cut back overhang and removed a broken branch from the Community Garden
  • assisted IDVERDE with a tidy up at the caravan site off Dawley Road
  • strimmed around the railings on the West Centre Way footbridge
  • strimmed around the verge to improve the sight line for traffic on Rock Road at the former dog grooming site
  • strimmed down the wildflower beds on Lawley Drive
  • strimmed around the pond on Lawley Village Green
  • strimmed around the entrance to Overdale and Blackbird Close off Rock Road

PET WORK WEEK COMMENCING 1ST APRIL

Work was completed in the following areas:

  • pruned overhanging holly at the rear of Newdale School
  • removed fallen branches from the grass verge at St Helier
  • pruned the path edge and removed overhanging branches from the path at Park Road
  • removed fly tipped garden waste from outside the Linden Centre, Overdale
  • swept up broken glass from the pavement on Rock Road motorway bridge
  • swept debris from the decking at Old Park pond and removed mud from the footpath
  • removed debris after vandals set fire to the bench at Old Park pond
  • removed a fly tip of household waste from Colliers Way
  • removed overhanging branches from the footpath at Glendale opposite the village green
  • swept grass from the footpath following the TWC tractor mow on Bellpit Open Space, Lawley Village Green and Overdale playing field
  • weeded  the path edge at Glendale bus stop
  • scraped mud from the footpath and swept at Princes End car park
  • swept bark and mud from the path at Old Park pond
  • edged around the bus stop on Station Road

Further update re Phase 6 finishing works

We have received further update on phase 6 following queries from residents.

Persimmon have sent the following information:

“Darrall Road and part of Monastery Close will be closed for 2 days from 28/05/19 to 30/05/19 to allow the roads to be surfaced.

Signs are being put up on site regarding the road closure and a letter was sent out on Friday to the affected Residents.

There will be further temporary road closures as the works progress to allow the roads to be topped, we will ensure the affected Residents are notified.”

Letter regarding road closure 28.05.19-29.05.19 Lawley Phase 6